© Hawe Earthmoving 2015
Recent developments/projects
•
We have recently completed a residential subdivision, Belle Eden Estate, in
November 2013 - a 25 lot subdivision including 500m of roads, all sewer,
water reticulation and stormwater drainage.
•
Residential Subdivision Branyan by the River Stage 2. 30 lot subdivision
including 900m of roads, all sewer, water reticulation and stormwater
drainage. Installation of parklands and stormwater treatment devices.
•
Waste Transfer Station Upgrade for Bundaberg Regional Council. Including a
3m high retaining wall, hard stand area, rock boulder wall and safety fencing
to top of wall.
•
The last 2 years we have been undertaking machine hire for both Abi Group
and Lend Lease undertaking flood repair works to local roads.
•
Early Earthworks for Palmlakes Retirement Village High Care facility.
Currently Undertaking
•
Friendlies Hospital new medical suites, we are undertaking all earthworks
and road widenings .
•
Sanctuary Park Residential Subdivision
•
One Mile Crossing Stages 2B and 2C
•
Paddington Grove Stage 6
•
New Market Place carpark at Scotland Street East Bundaberg
•
We also have contracts with Bundaberg Regional Council to operate 3 of its
waste facilities involving handling and compacting everyday refuse, sorting
material for recycling, handling green waste and loading out mulch.
Types of Work undertaken by company
•
Roadworks
both
rural
roads
and
sealed
roads
including
kerb
and
channel,
sprayed bitumen surfacing and asphalt surfacing.
•
Stormwater
drainage
-
rural
and
residential
including
headwalls
and
associated pits and manholes.
•
Stormwater
treatment
devices
both
ready-made
and
also
devices
made
site
specific.
•
Block
work
retaining
walls
(we
undertake
all
steel
work
and
footings
and
a
qualified bricklayer/blocklayer does the wall).
•
Boulder
retaining
walls
(basically
bidum
placed
down
and
large
rocks
stacked to form a wall).
•
Bridge
abutments
for
cane
railway
networks.
Includes
new
installations
and
upgrades.
•
Pier holes, steel work and headstocks.Forestry roads and fire breaks .
•
Forestry.Intersection
Upgrades
for
both
private
and
commercial
entries
onto Main Roads.